Restauration Projects (pending loading all pictures)
Joan III acquisition before survey restauration after Carl Alberg The Alberg 37

Finishing aft deck
Interior

Stripping all teak oil and revarnishing
Painting ceiling
Installing A/C
New gaskets in portholes and hatches
Re-tabbing bulkheads
Painting ceiling
Installing A/C
New gaskets in portholes and hatches
Re-tabbing bulkheads
Moving sinks from under staircase to starboard

Better access to engine and avoiding leaks on the engine. Access to electrical board improved.